Projects

  • Sherburn-in-Elmet level crossing

    Mosaic Rail partnered with Aureos to support the Sherburn in Elmet Level Crossing Life Extension, a targeted renewal project designed to extend the operational life of signalling assets while maintaining the existing level of safety and functionality.

  • Midland Mainline

    Mosaic Rail provided specialist signalling design and assurance support to Amey Consulting as part of the Midland Main Line Electrification (MMLE) programme — one of the UK’s most significant rail decarbonisation projects.

  • K9 Signal Life Extension

    Mosaic Rail were engaged by Network Rail to provide signalling design and assurance services for the Knaresborough K9 Signal Life Extension Project, part of a safety-critical programme.

  • Driffield Skerne Road

    Mosaic Rail partnered with Network Rail to deliver the Driffield Skerne Road Mechanical Barrier Conversion, a modernisation project aimed at improving safety, reliability, and maintainability on the Hull to Seamer route.

  • Sherburn-in-Elmet level crossing

    Mosaic Rail partnered with Aureos to support the Sherburn in Elmet Level Crossing Life Extension, a targeted renewal project designed to extend the operational life of signalling assets while maintaining the existing level of safety and functionality.

  • Midland Mainline

    Mosaic Rail provided specialist signalling design and assurance support to Amey Consulting as part of the Midland Main Line Electrification (MMLE) programme — one of the UK’s most significant rail decarbonisation projects.