Recent Projects

  • Sherburn-in-Elmet level crossing

    Mosaic Rail partnered with Aureos to support the Sherburn in Elmet Level Crossing Life Extension, a targeted renewal project designed to extend the operational life of signalling assets while maintaining the existing level of safety and functionality.

  • Midland Mainline

    Mosaic Rail provided specialist signalling design and assurance support to Amey Consulting as part of the Midland Main Line Electrification (MMLE) programme — one of the UK’s most significant rail decarbonisation projects.

  • K9 Signal Life Extension

    Mosaic Rail were engaged by Network Rail to provide signalling design and assurance services for the Knaresborough K9 Signal Life Extension Project, part of a safety-critical programme.

  • Driffield Skerne Road

    Mosaic Rail partnered with Network Rail to deliver the Driffield Skerne Road Mechanical Barrier Conversion, a modernisation project aimed at improving safety, reliability, and maintainability on the Hull to Seamer route.

Contact
Our Team

Name(Required)

Our Clients

In The News

  • Manchester Piccadilly JOSS Lock Point Conversions

    Mosaic Rail Ltd is proud to have successfully delivered the detailed design of replacement point operating equipment at Longsight Maintenance Depot on behalf of our valued client VolkerRail.

  • Hessle Road NX Panel

    We are proud to have been part of the successful commissioning of the new Hessle Road NX Panel, marking another major milestone for the network.